Quick answer
What are the phases of an office design project?
An office design project has eight phases: discovery and requirements, space and program requirements, team selection, design development, documentation and procurement, construction and implementation, move-in and transition, and post-occupancy. This systematic sequence runs roughly 30-36 weeks and prevents budget overruns, timeline delays, and disappointing results.
Key Takeaways
- A systematic office design checklist spans eight phases, from discovery and requirements through post-occupancy evaluation and optimization.
- Office projects fail from bad planning, not bad design, with mid-project fixes costing 3-10 times more than getting decisions right initially.
- Budgets should include a 10-15% contingency, and timelines should plan for growth projections of at least two to three years.